COMPLETED PROJECTS

Hilton Kampala Hotel Project

The hotel has 300 rooms, 9 restaurants, 10 meeting rooms, and 1 ballroom. Commlead Engineering Ltd commissioned MEP systems, fire protection systems, guest rooms, Elevators, kitchens, laundry, swimming pools and landscaping. Quality control, Snagging and de-snagging. Installation of Class B/2 hours’ fire rated seals to the entire project

Mercure Gold Hotel Almina Road Dubai Accor Hotels

This is a 4-star hotel operated by Accor group of hotels situated at Almina Road front of DRY DOCKS DUBAI, Commlead Engineering Ltd participated in renovation to the project upgrading from 3 stars to 4-star entire building MEP, upgrades of Guest rooms, Restaurants, front of house including meeting rooms Quality control to the entire hotel furniture’s Snagging & De snagging.

La Cantine Du Faubourg

This is a 5-star French restaurant situated at Jumeirah Emirates towers on Sheikh Zayeed road Dubai UAE: Commlead Engineering Ltd worked closely with the client representing him from the construction subbies participated in all preparation testing and commissioning of MEP, HVAC, FLS, civil works testing and commissioning of all kitchen equipment’s including Elevators walk inn coolers and sound system upgrading of all works done to prepare for opening.

Ole Sereni Hotel Nairobi Kenya

The Hotel has 68 rooms 1 Restaurants, 2 meeting rooms, a Swimming pool and Landscaping: Commlead Engineering ltd: installed class B fire rated insulation to entire hotel penetration commissioned the entire building Elevators Mechanical Electrical & Plumbing (MEP)Fire & Life Safety upgrading of the project and Quality control. Snagging and de-snagging.

Tulip Hotel Kampala Uganda

The Hotel has 140 rooms 2 Restaurants, 3 meeting rooms, a Swimming pool and Landscaping: Commlead Engineering ltd: installed fire suppression class B/ fire rated insulation to entire hotel penetration commissioned the entire building Mechanical Electrical & Plumbing (MEP)Fire &Life Safety upgrading of the project and Quality control. Snagging and de-snagging.

Hilton Garden Inn Kampala Uganda

The Hotel has 180 Rooms, 1 Restaurant, meeting rooms, a Swimming pool and Landscaping: installed 2-hour fire rated insulation to entire hotel Commlead Engineering Ltd Commissioned entire building including Elevators MEP, FLS upgrading of the project, Quality control for the work done by Subcontractors, Snagging and De-Snagging,

Image of the Hilton Garden Inn Kampala

Hilton Garden Inn Lusaka

The Hotel has 148 Rooms, 1 Restaurant,6 meeting rooms, a Swimming pool and Landscaping: Commlead Engineering Ltd Commissioned entire building MEP, FLS upgrading of the project, Quality control for the work done by Subcontractors, Snagging and De-Snagging This includes Society Business Park Shopping Mall Testing Commission and certification of Guest and Staff Elevators. Installation of Class B/2 hours’ fire-rated seals to the entire project.

Modern Record Center, a Project of the National Pension Scheme Authority

This is three storey modern Repositories for all NAPSA files: Commlead Engineering Ltd installed fire suppression and 2 hours’ fire rated seals to the entire project Testing & Commissioning Mechanical Electrical & Plumbing/Fire Life &Safety upgrading of the project, Quality control for the work done by Subcontractors, Snagging and De-snagging Testing Commission and certification of Elevators

Hilton Garden Inn Hotel Windhoek Namibia

The Hotel has 180 rooms 1 Restaurant, 2 meeting rooms, and a Swimming pool: Commlead Engineering Ltd: installed 2-hour fire-rated insulation to the entire hotel project commissioning the entire building Mechanical Electrical & Plumbing (MEP)/Fire Life &Safety Testing Commission and certification of Guest and Staff Elevators.

ABSA Head Office Behind Show Ground Lusaka Zambia

This is an on-going project behind show ground it consists of 3 floors and Plantroom Commlead Engineering ltd: Staff are currently installing Designed and installed fire suppression fire rated insulation to entire project as per AECOM design project commissioning the building Mechanical Electrical & Plumbing (MEP) Fire & Life Safety Testing Commissioning and certification.

Public Service Pension Fund Mall At Long Acres

This is new mall located at long acres, the mall consists of office and entertainment blocks varieties of shopping area including pick n pay, casino and 5-star hotel Commlead Engineering Ltd installed class A fire insulation to the two blocks. Quality control for the work done by Subcontractors, Snagging and De-snagging, working close with the consultant advising concerning the progress of the project.

New Long Acres Park Inn Hotel By Radisson

This project on progress the Hotel has 140 rooms 3 Restaurants, 4 meeting rooms, and a Swimming pool: Commlead Engineering Ltd: Designed and installed fire suppression 2-hours fire rated insulation to entire hotel project snagging and de snagging entire project as per Carson rezidor standards the entire building Mechanical Electrical & Plumbing (MEP) Fire&LifeSafety, Testing Commission and certification of Guest and Staff Elevators.

New Kenneth Kaunda International Airport Lusaka

Commlead Engineering Ltd: Designed and installed a 2-hour fire-rated insulation part of the building snagging and de-snagging the entire project as per Fire and life standards Testing and Commissioning for Mechanical Electrical & Plumbing (MEP) Fire & Life Safety.

Radisson Blu Resort, Mosi-Oa-Tunya National Park Livingstone, Zambia

This Consist of a contemporary 174 rooms main Hotel and 26 luxurius villas 2 Restaurants, 6 meeting rooms, and a Swimming pool: Commlead Engineering Ltd: Designed and installed 2-hours fire rated insulation to entire hotel project snagging and de snagging entire project as per Carson rezidor standards the entire building Mechanical Electrical & Plumbing (MEP) Fire&LifeSafety, Testing Commission and certification of Guest and Staff Elevators.